It’s been said many times already but cities really need to get their public transit in order so they can fix traffic congestation and improve the lives of their residents but I still have some questions about some ideas I had.
-
How much would it cost for a city to electrify their entire bus fleet? Yes, people taking the bus is still a good thing but a lot buses still run on some fossil fuel.
-
How much would it cost a city with no rail/metro infrastructure to create it from scratch?
For a reasonably sized transport association it will be outright impossible to electrify an entire fleet at once:
You don’t need too much infrastructure to start transitioning: You can add charging infrastructure to on one or two terminal stops, upgrade one bus depot, educate 10% of your mechanics and start by upgrading all the lines going to these terminal stop. In the next year you upgrade the next terminals, the next depot and train another 10% of your mechanics. After a decade you’re fully electric without a big hassle.