Growth in german wind capacity is slowing. Soo… then the plan is to keep on with lignite and gas? Am I missing something?

Installed Wind Capacty - Germany

German Wind Capacity

  • NataliePortland@lemmy.ca
    link
    fedilink
    English
    arrow-up
    0
    ·
    1 year ago

    Wow I’m surprised to see people are actually downvoting you and arguing about this. It’s common knowledge that the cost, impact, and build-time of new nuclear plants makes them a poor choice for energy. Not only is wind/ solar cheaper, it’s faster to build.

    • regul@lemm.ee
      link
      fedilink
      arrow-up
      0
      ·
      1 year ago

      It’s also common knowledge that the more often you build something, the lower its price tends to go as that knowledge spreads. It’s part of the reason it’s so expensive to build trains in the US and so cheap in South Korea and Spain.

          • It is not a yes and, because urgency favors renewables even more. If it wouldn’t be for bureaucratic and political hurdles, from planning to operation is about 2 years for onshore wind and solar sites. For things like retrofitting a small solar plant on a residential or industrial building it can be as short as three months and for balcony solar power as a small hobby project it is as little as a day of planning + the delivery time + a day of installation.

            Nuclear plants on the other side take minimum a decade, more likely two decades and that is despite strong political and bureaucratic support that is needed to get it going at all. Otherwise with citizens protest it would stay in court indefenitely.