• variants@possumpat.io
    link
    fedilink
    English
    arrow-up
    22
    ·
    2 months ago

    As someone who works in manufacturing this makes prefect sense and wish more instructions were this clear

      • Petter1@lemm.ee
        link
        fedilink
        arrow-up
        9
        ·
        2 months ago

        Tighten them but tighten them not too much but make sure not to tighten them too less, I guess

      • variants@possumpat.io
        link
        fedilink
        English
        arrow-up
        3
        ·
        2 months ago

        Like put them in a few threads but don’t tighten then yet until you complete the next step

      • ayyy@sh.itjust.works
        link
        fedilink
        arrow-up
        3
        ·
        2 months ago

        It means “put all of the screws in the holes in order to start guiding the surfaces that you’re screwing together into the correct position, but don’t firmly tighten down all the screw until you have put all of them in so that you can ensure proper alignment of everything before you lock it in.”

          • 0x4E4F@sh.itjust.worksOP
            link
            fedilink
            English
            arrow-up
            3
            ·
            2 months ago

            Yeah, it’s fairly obvious to me as well. That’s basic assembly procedure, you don’t tighten them fully until you have them all in place.

            This manual will just confuse me, I’ll just follow the assembly plan without actually reading it 😁.