• partial_accumen@lemmy.world
    link
    fedilink
    English
    arrow-up
    2
    ·
    7 hours ago

    Are the largest power consumption steps of semi conductor product happening 24/7? Could we simply align manufacturing times with useful solar production times? So no need to store all the solar power, with the idea of consuming most of it immediately for manufacturing. Then pass a run that Semi conductor fabs have to build out their own solar arrays to cover most of their power consumption.

    • Kidplayer_666@lemm.ee
      link
      fedilink
      English
      arrow-up
      2
      ·
      6 hours ago

      Chances are yes. Simply because to build the machines, such an astronomical amount of money and energy is needed to build them, that even if electricity during dead times cost a bunch more (which for businesses probably does), it probably is still worth it, just to bring it to maximum capacity