minus-squaremosiacmango@lemm.eelinkfedilinkEnglisharrow-up2·edit-22 hours agoThese are grid scale projects. Each one is designed to power 100s of thousands of homes. Based on the data I can find, 35MW datacenters are what AI will require by 2030. The project I linked above could power 20+ of them at once by itself.
These are grid scale projects. Each one is designed to power 100s of thousands of homes.
Based on the data I can find, 35MW datacenters are what AI will require by 2030. The project I linked above could power 20+ of them at once by itself.