I’m all for putting solar panels all over the place, but won’t these get dusty and oily and need loads of cleaning after trains pass over?

Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).

  • DaPorkchop_@lemmy.ml
    link
    fedilink
    arrow-up
    5
    ·
    4 hours ago

    This is Switzerland, outside of a small number of corridors the majority of tracks see virtually nothing but passenger trains.