[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • JasonDJ@lemmy.zip
    link
    fedilink
    English
    arrow-up
    0
    ·
    edit-2
    4 months ago

    Nuclear is mostly expensive because of regulations and red tape that are mostly built upon FUD.

    That needs to be re-addressed from the ground up. There needs to be a big PSA push on the safety of nuclear and on the true costs and hidden dangers of coal and oil plants to build massive public support, and then we got to fix the outdated regulations.

    Also, coal plants aren’t cheap. And coal has costs that are heavily subsidized by society. If you could calculate all of the external costs and level out subsidies, nuclear is cheaper and, more importantly, far far safer, than any GHG plant.

    • AggressivelyPassive@feddit.de
      link
      fedilink
      English
      arrow-up
      0
      ·
      4 months ago

      The alternative to nuclear isn’t coal…

      And if you seriously think regulations are the problem, you’re denser than the lead shielding you want to get rid of.