    The known unknowns and especially the unknown unknowns never get factored into an estimate. People only ever think about the happy path, if everything goes right. But that rarely every happens so estimates are always widely off.

    The book How Big Things Get Done describes a much better way to factor in everything without knowing all the unknowns though - Just look a previous similar projects and look how long they took, take the average and bounds then adjust up or down if you have good reason to do so. Your project will very likely take a similar amount of time if your samples are similar in nature to your current task. And the actual time already factors in all the issues and problems encountered and even if you don’t hit all the same issues your problems will likely take a similar amount of time. And the more previous examples you have the better these estimates get.

    But instead of that we just pluck numbers out of the air and wonder why we never hit them.

    • HubertManne@moist.catsweat.com
      link
      fedilink
      arrow-up
      2
      ·
      3 months ago

      yeah I have literally had something where I list off a bunch of problmatic stuff and how it could be some high side and then follow up or everything could go swimmingly which never happens and we could have this low side and they are like ok so the low side. no. no. that is not what im saying.