• kindenough@kbin.earth
    link
    fedilink
    arrow-up
    30
    arrow-down
    1
    ·
    2 months ago

    It does make total sense.

    Bezos needed to de-construct a bridge in the Netherlands because his new build yacht wouldn’t go through. Fokker paid for it too, probably a fraction of that floating monstrosity. We did not like it one bit but the city of Rotterdam pulled their pants down and bended over.

      • SaharaMaleikuhm
        link
        fedilink
        English
        arrow-up
        15
        ·
        2 months ago

        All I can find is articles about how they did NOT tear down the bridge because the locals were obviously outraged. The city would have done it.

      • ℍ𝕂-𝟞𝟝@sopuli.xyz
        link
        fedilink
        English
        arrow-up
        3
        ·
        2 months ago

        It’s a historic railroad bridge that has not been used for a while, steel construction, and it has been taken apart and put together many times before, sometimes for maintenance. IIRC the current mayor promised the people not to do it again, and then came Bezos, and then they didn’t take it apart, they installed the yacht’s masts downstream instead.

        This is the bridge in question: https://en.wikipedia.org/wiki/De_Hef