• ChaoticNeutralCzech
    link
    fedilink
    English
    arrow-up
    145
    arrow-down
    1
    ·
    edit-2
    10 days ago

    Amateurs.

    The 1963 Černý Důl – Kunčice nad Labem aerial ropeway is over 8 km (5 mi) long, over 30 m high in places and carries 135 tons of limestone every hour from a quarry to the nearest train station. Its 120kW 3-phase synchronous motor requires power for a few minutes at the start and end of each day when most of the 800kg-capacity trolleys are empty, and spends most of the shift generating mains electricity and acting as a speed governor. Unlike the EV, it is fully autonomous most of the way, only 5 people are required to operate it. (Loading, unloading and timed dispatching is automatic, arriving/leaving carts just need to be checked; a safety latch has to be manually dis/engaged on trolleys passing the check.) The quarry will continue operation as long as it pays off, then the ropeway will be scrapped (projected 2033). A dude illegally rode the way up on it somewhat recently. He could have fallen to his death if he pulled the latch.

    • SomeoneSomewhere@lemmy.nz
      link
      fedilink
      English
      arrow-up
      14
      ·
      11 days ago

      I wouldn’t be surprised if there are electrified railway lines doing the same. Regenerate large amounts of energy into the grid while descending loaded; consume a relatively small amount of energy to haul the empty train back uphill.

    • residentmarchant@lemmy.world
      link
      fedilink
      English
      arrow-up
      8
      ·
      edit-2
      11 days ago

      Content aside, what a great video! It’s not that old of a video but it reminds me so much of early YouTube, just friends messing around and posting it with top tier song choice.

      • ChaoticNeutralCzech
        link
        fedilink
        English
        arrow-up
        3
        ·
        10 days ago

        I know, this one is shorter and has mechanical brakes. Not as great but I imagine the Czech one, one of the largest in Europe, has very few English-language sources that could have pointed it out to him. I don’t know whether the Claughton one cannot be ridden or Tom is just squeamish about safety (see description) but the Černý Důl one definitely can, that’s how they do routine inspections.