Inspired by the very similar thread about school incidents.

  • leisesprecher
    link
    fedilink
    arrow-up
    5
    ·
    26 days ago

    I’m not talking about the incident in Romania, but in Germany.

    A shipyard needed some wires over a river deactivated and that caused an overload cascade, because the river was the border between two providers who had different assumptions about the capacity of the power lines connecting them.